If you look closely you can see the added piece and the rope appearing as it is carved.
I actually run this same file twice on the Mulitcam CNC router to give me both sides of the sign.
A little pipe here, some threaded rod there, a couple of links cut from a scrap piece of chain and presto, the structural hanging pieces are done.
alot pf pressure here !!!!!
or should I say
"The big Squeeze"
Using Sculpting epoxy clay, I've added some detail to the Sign (note the Rivets)and some shape to the Sampson posts.
I'm hoping I'll be able to post some photos after he has completed the finishing procss.
I crated and shipped it.
THE BARGE HAS LEFT PORT DESTIN FOR IT'S NEW HOME ON SHELTER ISL. NEW YORK.